Skip to content
Handwriting ToolsTry it free

Handwritten Construction Bill Generator

Contractors bill work, not products: plastering by the square foot, brickwork by the cubic foot, tiling, painting, plumbing or electrical work, plus materials supplied and labour, usually as a running bill with advances already received. This handwritten construction bill generator gives you templates for civil, painting, plumbing and labour contractors. Enter the client and site, add each item of work with its measurement, unit and rate, and the amounts, materials, labour, advance received and balance are calculated for you, with the total in words. Add your signature, edit any line on the page, and download a PNG, JPG, PDF or Word file to share with the client. It is free and easy to use on a phone at the site.

Use responsibly: Create bills only for real sales and services of your own business, or for practice, training and design mockups. Do not create a bill for a purchase that did not happen or change real amounts, and do not use generated bills for reimbursement, insurance or tax claims.

Bill type

36 bill types in 4 groups. Type to search.

Construction / Contractor bill templates

5 templates · your entries are kept when you switch

Tap any text on the bill to edit it.

Download

Construction and contractor bills, measured and clear

A construction bill is built on measurements. The house owner agreed a rate per square foot for brickwork, per running foot for skirting, per cubic metre for concrete, or per day for labour — and the bill turns those rates into amounts based on what was actually done. When the measurements are written clearly, the owner can check them with a tape; when they aren't, every bill becomes an argument. Contractors, mistris, painters, plumbers, electricians and interior teams all face the same problem.

This construction bill generator gives contractors a neat, handwritten-style bill with items of work, units, measured quantities, rates, materials and labour separated, previous bills and advances, retention, GST where applicable, and the total in words. Download it as a PDF on A4 for the owner's file, or send an image on WhatsApp the day the work is measured.

Construction bill format

  • Header: contractor or firm name, address, phone, PAN and GSTIN if registered.
  • Bill details: bill number (e.g. "RA Bill No. 3"), date, client name, site address and work order reference.
  • Items of work: description of each item, unit (sq ft, rft, cu ft, cum, nos, day), quantity measured, rate and amount.
  • Material and labour: separate sections or lines if you supply both.
  • Deductions: previous bills paid, advances adjusted, retention money, TDS if the client deducts it.
  • Totals: gross amount of this bill, GST if applicable, net payable, and amount in words.
  • Footer: measurement date, signatures of contractor and client or site engineer.

How to make a bill of construction work

  1. Measure the work with the client or their engineer, and note the measurements.
  2. Choose the construction template and enter your firm's details.
  3. Add each item of work with its unit, measured quantity and agreed rate — the amount is calculated.
  4. Add material and labour lines separately where you supply both.
  5. Enter previous payments and advances in Bill settings to show the net payable.
  6. Download, sign and send with the measurement sheet.

Running bill (RA bill) explained

On longer jobs, contractors are paid in stages through running account bills (RA bills). Each RA bill shows the cumulative work done to date, minus the amount already paid in earlier bills, so the client pays only for new work. The last bill is the final bill, which settles everything, including any retention money held back. A clear RA bill shows: total work done till date, previous bills paid, this bill's amount, and deductions. Number them in order — RA 1, RA 2, RA 3 — so the history is easy to follow.

Construction bill sample (RA bill)

Sample RA Bill No. 3 — Ground floor, Plot 42 (rates illustrative)
Item of workQtyRate (₹)Amount (₹)
Brickwork 9" in CM 1:6 (cu ft)1,850951,75,750
Internal plaster 12 mm (sq ft)2,4002867,200
RCC lintel and chhajja (cu ft)12038045,600
Work done till date2,88,550
Less: RA bills 1 and 2 paid− 1,60,000
Amount of this bill1,28,550

To show this in the generator, list the cumulative items, then enter the previous payments in the "Advance / paid" box; the balance is the amount of this bill. Add retention or TDS as notes or discount lines, as agreed with the client.

Labour bill format

Labour contractors bill by work done or by days worked. A labour bill format for daily labour lists each category with the number of mandays and the daily rate:

  • "Mason (mistri) — 24 days @ ₹900"
  • "Helper (beldar) — 48 days @ ₹600"
  • "Carpenter — 10 days @ ₹1,000"

Write the period ("1–15 November") and the site, and attach the attendance sheet. For piece-rate labour, bill by the measured work instead ("Tile fixing labour — 850 sq ft @ ₹30"). A labour bill format without GST is common because most small labour contractors are below the registration limit; registered contractors add GST as applicable. You can keep a labour bill format in Word or a labour bill format in Excel for your attendance records and make the bill itself here.

Measurement units and rates

The most common source of disputes is units. Write the unit with every item and agree the measurement method in advance:

  • sq ft / sq m — flooring, plaster, painting, tiling (state whether openings are deducted).
  • rft (running feet) — skirting, railing, cornices, pipes.
  • cu ft / cum — brickwork, concrete, excavation.
  • nos — doors, windows, fixtures, points (electrical points counted per point).
  • lump sum — small items agreed at a fixed price.

Construction bill format with GST

Construction services and works contracts are taxed under GST, commonly at 18%, with different rates or exemptions for certain housing projects, government works and pure labour contracts for a single residential unit. Rates and conditions change, and the right treatment depends on the type of project and client, so confirm with your accountant. Registered contractors must issue tax invoices with their GSTIN and show the tax; contractors below the registration limit (₹20 lakh a year for services in most states) cannot charge GST. A construction bill format with GST should show the taxable value of the work, the GST rate and amount, and the client's GSTIN if they are registered.

In practice, a construction bill format with GST for a registered contractor also needs the SAC (service accounting code) for the work, the place of supply (the site's state) and, for business clients, their GSTIN — they need it to claim credit where the law allows.

Construction invoice vs. measurement bill

Larger clients sometimes ask for two documents: a measurement bill (or abstract of measurements) that lists every item, location and dimension — "Bedroom 2, walls: 2 × (12 + 10) × 10 ft = 440 sq ft, less door 21 sq ft" — and a construction invoice that summarises the items, rates and amounts for payment. Small jobs combine them into one bill. If your client wants both, keep the detailed measurements in your notebook or spreadsheet, and make the invoice here with the totals for each item and a reference to the measurement sheet.

Extra items and variations

Almost every job changes along the way: an extra window, a different tile, a wall moved. Treat each change as an "extra item" with its own description, unit, quantity and rate, and get the owner's approval — a WhatsApp message is enough — before doing the work. List extra items in a separate section of the bill headed "Extra items (approved)", with the approval date. Owners accept extra charges far more easily when they can see each one was agreed. Items removed from the original scope should be listed too, as deductions, so the bill reflects the work as it was actually done.

Advances and mobilisation

Many contractors take an advance before starting — to buy initial material and pay the first week's labour. Record it on the first bill and adjust it against later bills, either in one go or in instalments as agreed. Each bill should show how much of the advance has been adjusted and how much remains, so the final account is never a surprise. If the client supplies some material themselves — cement or steel, for example — note it on the bill so your labour rate is clearly understood as labour only.

TDS and retention

Business and institutional clients deduct TDS under section 194C (numbering of the Income-tax Act, 1961, renumbered in the Income-tax Act, 2025 from April 2026) on payments to contractors — 1% for individuals and HUFs, 2% for others — once payments exceed ₹30,000 in a single payment or ₹1,00,000 in a year. Many contracts also hold back retention money (often 5–10%) until the defect liability period ends. Show both on the bill as notes so your accounts match the client's payments.

Construction bill format in Hindi or Marathi

Many contractors and owners prefer item names in Hindi or Marathi. The handwriting fonts here are made for English letters, so write items in Hinglish — "Eent ki chinai (cu ft)", "Plaster (sq ft)", "Mistri hazri" — for the handwritten look. Devanagari text can be typed too, but it will appear in your phone's standard font.

Construction bill format in Word, Excel or PDF

Contractors often keep a construction bill format in Excel for measurements, or search for a construction bill format in Word or a construction bill format PDF to send. The measurement sheet is best kept in your spreadsheet; the bill itself is quicker here — items, units, rates and previous payments are calculated in one place, and the PDF is ready to sign and send.

Need the bill in Word? Click Word under the bill to download it as a .docx file, at the same A4, A5 or 80 mm thermal size as the PDF. It opens in Microsoft Word and Google Docs. The bill is placed in the file as a picture, so make any changes here and download it again.

Painters, plumbers, electricians and interior work

  • Painters: area in sq ft by surface (walls, ceiling), coats, product and colour.
  • Plumbers: points or fixtures installed, pipe lengths, and materials supplied.
  • Electricians: points (light, fan, plug), wiring per point, DB and MCB installation.
  • Interior teams: furniture items by size (e.g. "Wardrobe 7×8 ft, laminate finish"), with materials and hardware specified.

Construction bill checklist

  • Site address and work order reference.
  • Every item with unit, measured quantity and rate.
  • Material and labour separated.
  • Previous bills, advances and retention shown.
  • GST only if registered; PAN on the bill.
  • Measurement date and both signatures.

Related bill types

Building material suppliers use the hardware bill; freelancers and consultants such as architects can use the freelancer invoice; and transporters delivering material use the transport bill. See all types on the handwritten bill generator page.

Fair use

Issue construction bills only for work actually done, at measured quantities and agreed rates. Inflated measurements or bills for work not done are fraud, and owners and engineers can check every item on site.

Construction bill FAQs

What should a contractor bill include?

The contractor name and contact details, client name, site address, bill number and date, each item of work with its measurement, unit, rate and amount, materials and labour, advances received and the balance.

Can I bill by square feet or cubic feet?

Yes. Enter the measurement as the quantity with its unit, such as 450 sq ft, and the rate per unit.

What is a running bill?

A running bill is an interim bill for work completed so far on an ongoing job, with earlier payments deducted. Add previous payments as advances to show the balance.

Can I add labour and material separately?

Yes. Use separate lines or sections for materials supplied and labour charges, which also helps when the two are taxed or reimbursed differently.

Can I add GST to a construction bill?

Yes, if you are registered. Turn on the tax row and enter the rate that applies to your work.

How do I make a bill of construction work?

Measure the work with the client, then list each item with its unit, measured quantity and agreed rate. Separate material and labour, enter previous payments and advances in Bill settings, and download the bill with the measurement sheet.

What is a running account (RA) bill?

An RA bill is a stage payment bill on a longer job. It shows the cumulative work done to date minus the amount already paid, so the client pays only for new work. The last one is the final bill.

What is a labour bill format?

It lists each labour category — mason, helper, carpenter — with mandays and daily rates for a period, or the measured work for piece-rate labour, with the site and attendance attached.

What is the GST on construction work?

Construction services and works contracts are commonly taxed at 18%, with different rates or exemptions for some housing, government works and pure labour on a single residential unit. Confirm the treatment for your project with an accountant.

Do small labour contractors charge GST?

Not if they are below the GST registration limit — about ₹20 lakh a year for services in most states — and not registered. Their labour bill is issued without GST.

How much TDS is deducted on contractor payments?

Under section 194C, 1% for individuals and HUFs and 2% for others, when a single payment exceeds ₹30,000 or the year’s payments exceed ₹1,00,000. Note the TDS on the bill so accounts match.

What is retention money in construction?

It is a part of each bill — often 5–10% — held back by the client until the defect liability period ends, as security for repairs. It is released with or after the final bill.

Which units should a construction bill use?

The unit agreed for each item: square feet or metres for plaster, tiles and paint; running feet for skirting; cubic feet or metres for brickwork and concrete; numbers for fixtures and points.

Can I make a construction bill in Hindi or Marathi?

Write item names in English letters — "Eent ki chinai", "Plaster", "Mistri hazri" — for the handwritten look. Devanagari text can be typed, but it shows in your phone’s standard font.

Is there a construction bill format in Excel?

Keep your measurement sheet in Excel if you like; the bill itself is quicker here, with units, rates, previous payments and amount in words calculated and a PDF ready to sign.

How do painters bill their work?

By area in square feet for each surface — walls, ceilings — with the number of coats, product and colour, plus material if supplied. State whether door and window openings are deducted.

How do electricians bill by points?

Count the points installed — light, fan, plug, AC — and bill a rate per point for wiring, plus the DB, MCBs and materials as separate lines. Write the site and the date of completion.

Should material and labour be on the same bill?

They can be, on separate lines or sections. Separating them helps the owner compare material costs and is often needed when material and labour are taxed or paid differently.

What should the final construction bill include?

Total work done on the job, all previous payments, retention to be released or held, any extra items approved during the work, and the final amount payable, signed by both parties.

How do interior designers bill furniture work?

List each item with its size and finish — "Wardrobe 7×8 ft, laminate" — with materials and hardware specified and the rate per sq ft or per item, plus design fees separately.

All handwritten bill types

Each bill type has its own templates and fields.